proces plan lægning 2003 • 2026
     
   Use Google Chrome browser!   
      Login   
Password      
Fly to  



NEWS
updated  2026-01-19 at 18:20 (Warsaw time zone)

2021 - 2022
Fixes Fixed order lane height
Year drop-down lists are extended beyond 2025 (Under construction and test)

2021 - 2022
Consumption plan of cartons Cartons management Google Chrome compatibility
Cartons consumption plan is now available in addition to production plan, materials consumption plan, and labor consumption plan. Types of cartons can be edited on page "Cartons". Improved compatibility with Google Chrome browser v. 97.0.46xx.xx and later versions.

2018
Extension Output Control uncoupled Order bars rendering
Order's color field got extended from 12 to 25 characters.

Output Control (aka OPC) uncoupled from the spreadsheet. To enable/disable updating machines information from OPC, use the OPC check box in the strip under the main menu. Order bar rendering has changed

2016
Quick fix
Spreadsheet: the year selector of the order progress update time is fixed with respect to the year 2015 and later.


2012 - 2013
Comsumption plan improved Raw material management Database maintenance
Consumption plan was added validation rules helping one to find inconsistencies in order data, e.g. zero article mass, zero cycle time, or bad cavity definition. — to help a planner to add or edit raw materials at any time. New feature — order history truncation (menu/maintenance). All the orders in the database regardless of their department membership planned to start before the 1st shift of a specified date are irreversibly clean out however a backup of affected orders is being produced making the manual recovery possible upon request. Keeping the database free of unnecessary or irrelevant orders contributes to improving its performance.

2011
User management Integration with the OPC Improved functionality
New data manager's functionality—user mnagement. — is recovered — of "Machines", "Departments", and "Favourites"
Quick fix
of 2011 in "Update % relative to date"

2008 - 2010
New reports CSV-file issue OPC-cycle time
— "Orders of day", moulds report — fixed Order cycle time is calculated based on OPC- and PPS-cycle time

2007
OutputControl data in PPS Box => % calculator
Now critical OutputControl data like machine cycle time and on/off status is available directly on the spreadsheet The "box-to-%" order progress calculator was improved

April 26, 2006
Consumption plan Production plan
Raw material consumption plan is in effect New feature: displaying completed orders

February 22, 2006
Item cycle time Mould location is now more detailed Summary of errors and inconsistencies
Formerly an order's cycle time was determined by mould cycle time, item cycle time (if specified), and order cycle time (if specified). Now all mould cycle time information resides in corresponding items In addition to existing locations DK, GB, PL we added locations like DK->GB or PL->DK to reflect other party's request to receive the mould after it's free at its current location. First term means current location, second term is a reminder to a planner to send the mould to the place of its forthcoming use After intensive use or mass actions like machine transfer mould, item, and combivariant database may contain broken associations which causes no harm to the plan but degrades system's performance. Now planners have means to review the database state and fix inconsistencies themselves. More checks are eventually added. To access this feature, select menu/errors

August 14, 2005
New method of displaying late tasks Mould's forthcoming use Change of mould's country filter
Previously, late order and special tasks were displayed in black color no matter what their original colors were. Now bars remain in original, planner-defined colors, and if delaying, they appear on a special zebra background On the mould management page, a new mould attribute was added - mould's forthcoming use. If there exists an order in the future based on that specific mould, its start date is indicated along with country if different from the user's country On the mould management page, now you can filter moulds by a specific country e.g. DK, GB or PL, as you could previously, but also see all the existing moulds from all the countries. Use <All> in the country drop-down box

May 11, 2005
% and unscheduling
An order can be unscheduled (that is, returned to the clipboard) only if it's less than 100% ready

Mar 14, 2005
Auditing Order search Item-level cycle time
Now all changes of orders, item, mould, combivariant, and machine properties are logged. You can see the user and date of last change columns on corresponding pages Don't waste time browsing for an order on the spreadsheet. Use button "Find order" right to buttons "Create order" and "Cancel" to quickly locate an order having specific properties. Search options are: article number, raw material, color, purchase order number. Wildcard function - search using partial information. After finding the order, you can quick-jump to it on the spreadsheet Remember how an order's cycle time (CT) was taken: (1) mould CT was used, then (2) custom CT, if specified. Now you can specify CT for each specific price list item. To accomplish with that, use a new column "cycle time" of item properties. The new rule of calculating order's CT is: (1) mould CT; (2) if not 0, item CT; (3) if specified, custom CT

March 7, 2005
No "Unspecified Department" any more
Formerly you could created an order and address it to a specific department or leave it without department assignment by using the unspecified option in "Order for" of the order properties window. Now the latter option has discontinued